| DTC Code | DTC Name |
|---|---|
| P0778 | Pressure Control Solenoid "B" Electrical (Shift Solenoid Valve SL2) |
DESCRIPTION
Shifting from 1st to 5th is performed in combination with the "ON" and "OFF" operation of the shift solenoid valves SL1, SL2, S1, S2 and SR which are controlled by the ECM. If an open or short circuit occurs in one of the shift solenoid valves, the ECM controls the remaining normal shift solenoid valves to allow the vehicle to be operated smoothly (Click here).
| DTC Code | DTC Detection Condition | Trouble Area |
|---|---|---|
| P0778 |
Tip:
The SL2 output signal duty is less than 100% under normal conditions. |
|
MONITOR DESCRIPTION
This DTC indicates an open or short in the shift solenoid valve SL2 circuit. The ECM commands gear shifts by turning the shift solenoid valves "ON/OFF". When there is an open or short circuit in any shift solenoid valve circuit, the ECM detects the problem, illuminates the MIL and stores the DTC. The ECM performs the fail-safe function and turns the other normal shift solenoid valves "ON/OFF" (In case of an open or short circuit, the ECM stops sending current to the circuit).
While driving and shifting gears, if the ECM detects an open or short in the shift solenoid valve SL2 circuit, the ECM determines there is a malfunction (Click here).
INSPECTION PROCEDURE
The shift solenoid valve SL2 turns ON/OFF normally when the shift lever is in D.
| ECM gear shift command | 1st | 2nd | 3rd | 4th | 5th |
| Shift solenoid valve SL2 | ON | ON | ON | ON | OFF |
PROCEDURE
INSPECT TRANSMISSION WIRE (SHIFT SOLENOID VALVE SL2)
Disconnect the transmission wire connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| *a | Component without harness connected (Transmission Wire) |
CHECK HARNESS AND CONNECTOR (TRANSMISSION WIRE - ECM)
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| *a | Front view of wire harness connector (to ECM) |
INSPECT SHIFT SOLENOID VALVE SL2
Remove the shift solenoid valve SL2.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| OK | ||||
|---|---|---|---|---|
|
| *a | Component without harness connected (Shift Solenoid Valve SL2) |
REPAIR OR REPLACE TRANSMISSION WIREClick here
REPAIR OR REPLACE HARNESS OR CONNECTOR
REPLACE ECMClick here
REPLACE SHIFT SOLENOID VALVE SL2Click here