INSTALL SPARK PLUG
Install the 8 spark plugs.
INSTALL IGNITION COIL ASSEMBLY
Install the 8 ignition coils with the 8 bolts.
Connect the 8 ignition coil connectors.
CONNECT WATER PIPE AND HOSE SUB-ASSEMBLY
Connect the water pipe and hose and install the 2 bolts.
INSTALL AIR CLEANER ASSEMBLY
Install the air cleaner with the 3 bolts.
INSTALL AIR CLEANER HOSE ASSEMBLY
| *1 | Groove |
| *2 | Protrusion |
Install the air cleaner hose so that the protrusion of the air cleaner cap aligns with the groove of the hose as shown in the illustration.
Tighten the 2 clamps.
Connect the vacuum hose.
Connect the No. 2 ventilation hose.
INSTALL V-BANK COVER SUB-ASSEMBLY
| *1 | Bracket |
| *2 | Hook |
| *3 | Pin |
| *4 | Grommet |
Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
INSTALL NO. 2 ENGINE UNDER COVER
Install the No. 2 engine under cover with the 2 bolts.