IGNITION COIL AND SPARK PLUG INSTALLATION


  1. INSTALL SPARK PLUG


    1. Install the 6 spark plugs.

      Torque:
      18 N*m  { 184 kgf*cm, 13 ft.*lbf }
  2. INSTALL IGNITION COIL ASSEMBLY


    1. Install the 6 ignition coils with the 6 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the 6 ignition coil connectors.

  3. INSTALL NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)


    1. Install the No. 2 emission control valve set with the 3 nuts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. A015C4KE01
      Text in Illustration
      *1 Paint Mark
      *2 Rib
      *a Top
      *b LH Side

      Align the paint mark with the rib and connect the No. 1 air hose.

      Tech Tips

      Make sure the direction of the hose clamp is as shown in the illustration.

    3. Connect the No. 2 emission control valve set connector.

  4. INSTALL NO. 2 AIR TUBE (w/ Secondary Air Injection System)


    1. A015ASJE02
      Text in Illustration
      *1 Claw
      *2 No. 2 Air Tube

      Install 2 new gaskets.

      Note

      Make sure the gasket's claws are not caught between the No. 2 emission control valve set and No. 2 air tube.

    2. Install the No. 2 air tube with the 2 bolts and 2 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  5. INSTALL NO. 1 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)


    1. Install the No. 1 emission control valve set with the 3 nuts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. A015B8PE01
      Text in Illustration
      *1 Rib
      *2 Paint Mark
      *a RH Side
      *b Top

      Align the paint mark with the rib and connect the No. 1 air hose.

      Tech Tips

      Make sure the direction of the hose clamp is as shown in the illustration.

    3. Connect the No. 1 emission control valve set connector.

  6. INSTALL AIR TUBE (w/ Secondary Air Injection System)


    1. A015DETE02
      Text in Illustration
      *1 Claw
      *2 Air Tube

      Install 2 new gaskets.

      Note

      Make sure the gasket's claws are not caught between the No. 1 emission control valve set and air tube.

    2. Install the air tube with the 2 bolts and 2 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 in.*lbf }
  7. INSTALL AIR CLEANER CASE SUB-ASSEMBLY


    1. Install the air cleaner case with the 3 bolts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    2. Install the air cleaner filter element.

  8. INSTALL AIR CLEANER CAP AND HOSE


    1. A01592HE01
      Text in Illustration
      *a Top
      *b Front
      *c Protrusion (Hose)
      *d Protrusion (Throttle body)

      Install the air cleaner cap and hose.


      1. Install the air cleaner cap and hose with the bolt and fasten the 4 hook clamps.

        Torque:
        5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
      2. Tighten the clamp.

        Torque:
        2.5 N*m  { 25 kgf*cm, 22 in.*lbf }
      3. Attach the 4 clamps and connect the No. 2 PCV hose, vacuum hose and mass air flow meter connector.

        Tech Tips

        The direction of the hose clamp is indicated in the illustration.

  9. INSTALL V-BANK COVER


    1. A015D9LE01
      Text in Illustration
      *1 Pin
      *2 Hook

      Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.