Click here

PURGE VALVE INSPECTION

Click here
Click here Click here
  1. Click here

    INSPECT PURGE VSV


    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 23 to 26 Ω
      1 - Body ground Always 10 MΩ or higher
      2 - Body ground
      Tip:

      When measuring the coil resistance, make sure that the surface temperature of the purge VSV is 20°C (68°F).

      If the result is not as specified, replace the purge VSV.

    2. Check the operation of the purge VSV.


      1. A01557XE02

        Check that air does not flow from port E to port F.

        Table 1. Text in Illustration
        *1 Port E
        *2 Port F
        *a Does not flow
        A015DIT Air pressure
      2. A015AHWE01

        Apply battery voltage to the connector and check the VSV operation.

        OK
        Measurement Condition Specified Condition

        Battery positive (+) → Terminal 1

        Battery negative (-) → Terminal 2

        Air flows from port E to port F
        Table 2. Text in Illustration
        *1 Port E
        *2 Port F
        A015DIT Air pressure

        If the result is not as specified, replace the purge VSV.