Click here

AIR SWITCHING VALVE (for Bank 1) INSTALLATION

Click here
Click here Click here
  1. Click here

    INSTALL AIR SWITCHING VALVE ASSEMBLY


    1. A0159Y1E01

      Install a new gasket and the air switching valve with the 3 bolts.

      24 N*m 245 kgf*cm 18 ft.*lbf
      Table 1. Text in Illustration
      *1 No. 4 Air Tube
      *2 Claw
      *3 Air Switching Valve
      Note:

      Make sure the gasket's claws are not caught between the air switching valve and No. 4 air tube.

    2. Install the 2 bolts.

      10 N*m 102 kgf*cm 7 ft.*lbf
    3. Connect the wire harness clamp bracket with the bolt.

      8.0 N*m 82 kgf*cm 71 in.*lbf
  2. Click here

    CONNECT NO. 2 AIR INJECTION SYSTEM HOSE


    1. A015CXME01

      Connect the No. 2 air injection system hose.

      Table 2. Text in Illustration
      *1 Protrusion
      *2 Paint Mark
      Tip:

      Make sure the direction of the hose clamp is as shown in the illustration.

    2. Connect the connector.

  3. Click here

    INSTALL V-BANK COVER SUB-ASSEMBLY


    1. A015CPLE01

      Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

      Table 3. Text in Illustration
      *1 Grommet
      *2 Pin
      *3 Hook
      *4 Bracket