INSTALL AIR SWITCHING VALVE ASSEMBLY
Install a new gasket and the air switching valve with the 3 bolts.
| 24 N*m | 245 kgf*cm | 18 ft.*lbf |
| *1 | No. 4 Air Tube |
| *2 | Claw |
| *3 | Air Switching Valve |
Make sure the gasket's claws are not caught between the air switching valve and No. 4 air tube.
Install the 2 bolts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
Connect the wire harness clamp bracket with the bolt.
| 8.0 N*m | 82 kgf*cm | 71 in.*lbf |
CONNECT NO. 2 AIR INJECTION SYSTEM HOSE
Connect the No. 2 air injection system hose.
| *1 | Protrusion |
| *2 | Paint Mark |
Make sure the direction of the hose clamp is as shown in the illustration.
Connect the connector.
INSTALL V-BANK COVER SUB-ASSEMBLY
Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
| *1 | Grommet |
| *2 | Pin |
| *3 | Hook |
| *4 | Bracket |