Click here

AIR SWITCHING VALVE (for Bank 1) REMOVAL

Click here
Click here Click here
  1. Click here

    REMOVE V-BANK COVER SUB-ASSEMBLY


    1. A0158H7E01

      Raise the front of the V-bank cover to detach the 3 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.

      Table 1. Text in Illustration
      *1 Grommet
      *2 Pin
      *3 Hook
      *4 Bracket
  2. Click here

    DISCONNECT NO. 2 AIR INJECTION SYSTEM HOSE


    1. A0158SV

      Disconnect the connector.

    2. Disconnect the No. 2 air injection system hose.

  3. Click here

    REMOVE AIR SWITCHING VALVE ASSEMBLY


    1. A0158VN

      Remove the bolt and then disconnect the wire harness clamp bracket.

    2. A015C46

      Remove the 2 bolts.

    3. A015ABR

      Remove the 3 bolts, air switching valve and gasket.

      Note:

      Be careful not to damage the installation surface of the gasket.