PURGE VALVE INSTALLATION


  1. INSTALL PURGE VSV


    1. Install the purge VSV with the bolt.

      Torque:
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
    2. Connect the 2 purge line hoses.

    3. Connect the purge VSV connector.

  2. INSTALL V-BANK COVER


    1. A015D9LE01
      Text in Illustration
      *1 Pin
      *2 Hook

      Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.