AIR SWITCHING VALVE (for Bank 1) REMOVAL


  1. REMOVE V-BANK COVER


    1. A0159TNE01
      Text in Illustration
      *1 Pin
      *2 Hook

      Raise the front of the V-bank cover to detach the 2 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.

  2. REMOVE AIR CLEANER CAP AND HOSE


    1. A0159Q2

      Remove the air cleaner cap and hose.


      1. Disconnect the mass air flow meter connector, vacuum hose and ventilation hose and detach the clamp.

      2. Loosen the clamp.

      3. Unfasten the 4 hook clamps, and then remove the bolt and the air cleaner cap and hose.

  3. REMOVE AIR TUBE


    1. A015BGZ

      Remove the 2 bolts, 2 nuts and air tube.

    2. Remove the 2 gaskets.

      Note

      Be careful not to damage the installation surface of the gaskets.

  4. REMOVE NO. 1 EMISSION CONTROL VALVE SET


    1. A015646

      Disconnect the No. 1 emission control valve set connector.

    2. Disconnect the No. 1 air hose from the No. 1 emission control valve set.

    3. A0156S8

      Remove the 3 nuts and No. 1 emission control valve set.