ROOF DRIP SIDE FINISH MOULDING INSTALLATION

Tech Tips


  • Use the same procedure for the LH side and RH side.

  • The following procedure is for the LH side.


  1. INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP

    Note

    When installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.


    1. A01G463E01
      Text in Illustration
      *1 Adhesive
      *a 2 to 3 mm Bead of Adhesive

      Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to 2 new No. 1 roof drip side finish moulding clips.

      Tech Tips

      Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F))

    2. A01G9L9E01
      Text in Illustration
      *a Protruding Part

      Install the 2 new No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 No. 1 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).

      Standard Dimension
      Installation Area Dimension Measurement
      for Front Side A 3.0 mm (0.118 in.)
      B 3.4 mm (0.134 in.)
      C 3.0 mm (0.118 in.)
      D 3.0 mm (0.118 in.)
      for Rear Side E 2.9 mm (0.114 in.)
      F 3.9 mm (0.154 in.)
      G 3.5 mm (0.138 in.)
      H 3.5 mm (0.138 in.)
    3. Install the center roof drip side finish moulding when 20 minutes or more have elapsed after pressing and installing the No. 1 roof drip side finish moulding clips.

      Tech Tips


      • Initial hardening time: 20 minutes

      • Complete hardening time: 48 hours

  2. INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING


    1. A01G5FE

      Engage the 2 clips and install the center roof drip side finish moulding.