Tech Tips
Use the same procedure for the LH side and RH side.
The following procedure is for the LH side.
INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP
Note
When installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.
| *1 | Adhesive |
| *a | 2 to 3 mm Bead of Adhesive |
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to 2 new No. 1 roof drip side finish moulding clips.
Tech Tips
Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F))
| *a | Protruding Part |
Install the 2 new No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 No. 1 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).
| Installation Area | Dimension | Measurement |
|---|---|---|
| for Front Side | A | 3.0 mm (0.118 in.) |
| B | 3.4 mm (0.134 in.) | |
| C | 3.0 mm (0.118 in.) | |
| D | 3.0 mm (0.118 in.) | |
| for Rear Side | E | 2.9 mm (0.114 in.) |
| F | 3.9 mm (0.154 in.) | |
| G | 3.5 mm (0.138 in.) | |
| H | 3.5 mm (0.138 in.) |
Install the center roof drip side finish moulding when 20 minutes or more have elapsed after pressing and installing the No. 1 roof drip side finish moulding clips.
Tech Tips
Initial hardening time: 20 minutes
Complete hardening time: 48 hours
INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING
Engage the 2 clips and install the center roof drip side finish moulding.