AUTOMATIC HEADLIGHT BEAM LEVEL CONTROL SYSTEM Indicator Circuit

DESCRIPTION

The headlight beam level control system indicator light in the combination meter assembly comes on for approximately 3 seconds when the engine switch is turned on (IG). The indicator light also comes on when the headlight leveling ECU assembly detects a malfunction.

WIRING DIAGRAM

A01G7S2E05

INSPECTION PROCEDURE

PROCEDURE


  1. CHECK HEADLIGHT LEVELING ECU ASSEMBLY (INPUT SIGNAL)


    1. A01G8ODE08
      Text in Illustration
      *a

      Front view of wire harness connector

      (to Headlight Leveling ECU Assembly)

      Disconnect the A29 headlight leveling ECU assembly connector.

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Condition Specified Condition
      A29-6 (WNG) - Body ground Engine switch on (IG) 11 to 14 V
      Engine switch off Below 1 V

    NG
    OK
  2. CHECK HARNESS AND CONNECTOR (COMBINATION METER ASSEMBLY - HEADLIGHT LEVELING ECU ASSEMBLY)


    1. Disconnect the H14 combination meter assembly connector.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      A29-6 (WNG) - H14-3 (LVWG) Always Below 1 Ω
      A29-6 (WNG) - Body ground Always 10 kΩ or higher

    NG
    OK