NETWORK GATEWAY ECU INSTALLATION


  1. INSTALL NETWORK GATEWAY ECU


    1. Engage the 2 claws to install the network gateway ECU.

  2. INSTALL ECU INTEGRATION BOX RH (for LHD)

    Click here.

  3. INSTALL ECU INTEGRATION BOX RH (for RHD)

    Click here.

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.