GENERATOR INSTALLATION


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the generator assembly with the 2 bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
    2. Connect the wire harness clamp to the generator bracket.

    3. Install the generator bracket with the 2 bolts.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    4. Install the wire harness clamp with the bolt.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    5. Connect the wire harness with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    6. Install the terminal cap.

    7. Connect the connector.

  2. INSTALL V-RIBBED BELT

    Click here

  3. INSTALL V-BANK COVER SUB-ASSEMBLY


    1. Fit the 3 retainers and install the V-bank cover sub-assembly.

  4. INSTALL RADIATOR ASSEMBLY

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.