STARTER INSTALLATION


  1. INSTALL STARTER ASSEMBLY


    1. Install the starter assembly with the 2 bolts.

      Torque:
      37 N*m  { 377 kgf*cm, 27 ft.*lbf }
    2. Connect the connector.

    3. Connect the wire harness and install the nut, close the cap.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
  2. INSTALL BATTERY


    1. Install the battery and battery tray.

    2. Install the battery clamp with the bolt and nut.

      Torque:
      Bolt
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
      Nut
      3.5 N*m  { 36 kgf*cm, 31 in.*lbf }
    3. Connect the positive (+) cable to the positive (+) battery terminal.

      Torque:
      6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
  3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY


    1. A01G68JE01
      Text in Illustration
      *1 Air Cleaner Case Sub-assembly
      *2 Inlet No. 1 Air Cleaner
      *a Projection
      *b Hole

      Install the air cleaner case sub-assembly to the inlet No. 1 air cleaner.

    2. Insert the projection of the air cleaner case sub-assembly to the hole of the No. 2 air cleaner bracket as shown in the illustration.

    3. Tighten the 2 bolts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    4. Connect the 3 wire harness clamps, connector, vacuum hose and No. 1 fuel vapor feed hose.

  4. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

  5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY


    1. Connect the air cleaner cap sub-assembly to the throttle with motor body assembly with the hose clamp.

    2. Install the air cleaner cap sub-assembly to the air cleaner case with the 2 clamps.

    3. Connect the 3 hoses.

    4. Connect the ventilation hose.

    5. Connect the mass air flow meter connector and wire harness clamp.

  6. INSTALL INLET NO. 1 AIR CLEANER


    1. A01G4V3

      Install the inlet No. 1 air cleaner to the intake air resonator sub-assembly.

    2. Engage the pin to the radiator support.

  7. INSTALL INLET NO. 2 AIR CLEANER


    1. Install the inlet No. 2 air cleaner to the air cleaner case sub-assembly with the 2 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Connect the 2 wire harness clamps and vacuum hose clamp.

  8. INSTALL V-BANK COVER SUB-ASSEMBLY


    1. Fit the 3 retainers and install the V-bank cover sub-assembly.

  9. INSTALL COOL AIR INTAKE DUCT SEAL


    1. Install the cool air intake duct seal with the 9 clips.

  10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.