PTC HEATER ASSEMBLY INSTALLATION


  1. INSTALL QUICK HEATER ASSEMBLY


    1. A01G468

      Insert the quick heater assembly as shown in the illustration.

    2. Install the quick heater assembly with the 2 screws.

    3. Engage the 5 clamps.

    4. Connect the connector.

    5. Install the bolt.

      Torque:
      20 N*m  { 199 kgf*cm, 14 ft.*lbf }
  2. INSTALL NO. 1 AIR DUCT SUB-ASSEMBLY


    1. A01G8A6

      Engage the guide and 2 claws to install the No. 1 air duct sub-assembly as shown in the illustration.

  3. INSTALL SHIFT LEVER SUPPORT

    for U660E Automatic Transmission / Transaxle: Click here

    for U760E Automatic Transmission / Transaxle: Click here

  4. INSTALL INSTRUMENT PANEL SAFETY PAD ASSEMBLY

    Click here