ECM INSTALLATION


  1. INSTALL NO. 1 ECM BRACKET


    1. Install the No. 1 ECM bracket with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    2. Connect the 2 wire harness clamps.

    3. Install the nut.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  2. INSTALL ECM


    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    2. A01G9RKE01

      Temporarily install the screw (B).

    3. Install the ECM with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    4. Install the screw (A).

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    5. Tighten the screw (B).

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    6. Connect the 2 ECM connectors and lower the 2 levers.

      Note


      • When connecting the connectors, make sure that dirt, water or other foreign matter does not become stuck between the connectors and other part.

      • Make sure that the 2 levers are securely locked.

  3. INSTALL BATTERY


    1. Install the battery and battery tray.

    2. Install the battery clamp with the bolt and nut.

      Torque:
      Bolt
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
      Nut
      3.5 N*m  { 36 kgf*cm, 31 in.*lbf }
    3. Connect the positive (+) cable to the positive (+) battery terminal.

      Torque:
      6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
  4. INSTALL COOL AIR INTAKE DUCT SEAL


    1. Install the cool air intake duct seal with the 9 clips.

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  6. PERFORM INITIALIZATION

    Click here.