PURGE VALVE INSTALLATION


  1. INSTALL PURGE VSV


    1. Install the purge VSV to the cylinder head cover sub-assembly with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. A01G4T6E01
      Text in Illustration
      *a 2 to 7 mm (0.0787 to 0.276 in.)
      *b 90°
      *c LH Side
      *d Rear Side
      *e Paint Mark

      Connect the 2 fuel vapor feed hoses.

    3. Connect the wire harness clamp and connector.

  2. INSTALL V-BANK COVER SUB-ASSEMBLY


    1. Fit the 3 retainers and install the V-bank cover sub-assembly.