FUEL LID OPENER MOTOR ASSEMBLY INSTALLATION

PROCEDURE


  1. INSTALL FUEL LID LOCK WITH MOTOR ASSEMBLY


    1. Connect the connector.

    2. Engage the clamp.

    3. Install the fuel lid lock withe motor assembly with the nut.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    4. Engage the 2 claws.

  2. INSTALL LUGGAGE COMPARTMENT INNER TRIM COVER LH

    Click here

  3. INSTALL ROPE HOOK

    Click here

  4. INSTALL LUGGAGE HOLD BELT STRIKER ASSEMBLY (for LH Side)

    Click here

  5. INSTALL LUGGAGE COMPARTMENT FRONT TRIM COVER

    Click here

  6. INSTALL REAR FLOOR FINISH PLATE

    Click here

  7. INSTALL LUGGAGE HOLD BELT STRIKER ASSEMBLY (for Rear Side)

    Click here

  8. INSTALL SPARE WHEEL COVER PAD RH

    Click here

  9. INSTALL SPARE WHEEL COVER PAD LH

    Click here

  10. INSTALL LUGGAGE COMPARTMENT FLOOR MAT

    Click here