BLIND SPOT MONITOR SENSOR INSTALLATION

PROCEDURE


  1. INSTALL BLIND SPOT MONITOR SENSOR LH


    1. Install the blind spot monitor sensor LH with the 3 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the connector.

  2. INSTALL BLIND SPOT MONITOR SENSOR RH


    1. Install the blind spot monitor sensor RH with the 3 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the connector.

  3. INSTALL REAR BUMPER ASSEMBLY

    Click here

  4. PERFORM BLIND SPOT MONITOR BEAM AXIS INSPECTION

    Click here

  5. PERFORM BLIND SPOT MONITOR BEAM AXIS INSPECTION

    Click here

    SST
    09870-60000   ( 09870-60010 )
    09870-60040
  6. PERFORM DIAGNOSTIC SYSTEM CHECK

    Click here