POWER MANAGEMENT CONTROL ECU INSTALLATION

PROCEDURE


  1. INSTALL POWER MANAGEMENT CONTROL ECU


    1. for LHD:


      1. A0007S6E05

        Install the power management control ECU with the 2 nuts in the order shown in the illustration.

        Torque:
        7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
      2. Connect each connector.

    2. for RHD:


      1. A00098OE03

        Install the power management control ECU with the 2 nuts in the order shown in the illustration.

        Torque:
        7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
      2. Connect each connector.

  2. INSTALL LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY (for LHD)

    Click here

  3. INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY (for RHD)

    Tech Tips

    Use the same procedure for RHD and LHD Click here.

  4. INSTALL INSTRUMENT PANEL BOX DOOR COVER (for RHD)

    Tech Tips

    Use the same procedure for RHD and LHD Click here.

  5. INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY (for RHD)

    Tech Tips

    Use the same procedure for RHD and LHD Click here.