DESCRIPTION
The skid control ECU (brake booster with master cylinder assembly) is connected to the combination meter assembly via CAN communication.
CAUTION / NOTICE / HINT
Note
When replacing the skid control ECU (brake booster with master cylinder assembly), perform initialization and calibration of the linear solenoid valve Click here.
PROCEDURE
CHECK CAN COMMUNICATION SYSTEM
Check if CAN communication system DTCs are output Click here.
| Result | ||||||
|---|---|---|---|---|---|---|
|
| B |
|
INSPECT CAN COMMUNICATION SYSTEM Click here |
| A |
|
CHECK ABS WARNING LIGHT
Disconnect the A24 skid control ECU (brake booster with master cylinder assembly) connector.
Turn the power switch on (IG).
Check that the ABS warning light comes on.
| OK |
|---|
| The ABS warning light comes on. |
Tech Tips
If troubleshooting has been carried out according to Problem Symptoms Table, refer back to the table and proceed to the next step before replacing the part Click here.
| OK |
|
REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY Click here |
| NG |
|
INSPECT COMBINATION METER ASSEMBLY
Turn the power switch off.
Reconnect the A24 skid control ECU (brake booster with master cylinder assembly) connector.
Perform the Active Test of the combination meter assembly (meter CPU) using the GTS Click here.
Check the combination meter assembly.
| OK |
|---|
| The ABS warning light turns on or off in accordance with GTS operation. |
Tech Tips
If troubleshooting has been carried out according to Problem Symptoms Table, refer back to the table and proceed to the next step Click here.
| OK |
|
REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY Click here |
| NG |
|
REPLACE COMBINATION METER ASSEMBLY Click here |