Click here

SFI SYSTEM ECM Power Source Circuit

Click here
Click here
DTC Code DTC Name
  ECM Power Source Circuit
Click here

DESCRIPTION

When the power switch is turned on (IG), auxiliary battery voltage is applied to the IGSW terminal of the ECM. The output signal from the MREL terminal of the ECM causes current to flow to the coil of the No. 1 integration relay (EFI MAIN relay), closing the contact and supplying power to terminals +B and +B2 of the ECM.

Click here

WIRING DIAGRAM

Click here

CAUTION / NOTICE / HINT

Note:

Inspect the fuses for circuits related to this system before performing the following inspection procedure.

Click here

PROCEDURE


  1. Click here

    CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)


    1. Disconnect the ECM connector.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      D24-16 (E1) - Body ground Always Below 1 Ω

    • OKClick here
    • NG

      REPAIR OR REPLACE HARNESS OR CONNECTOR

  2. Click here

    CHECK TERMINAL VOLTAGE (IGSW VOLTAGE)


    1. A0005H8E03

      Disconnect the ECM connector.

    2. Turn the power switch on (IG).

    3. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Condition Specified Condition
      A22-37 (IGSW) - Body ground Power switch on (IG) 11 to 14 V
      Table 1. Text in Illustration
      *a

      Front view of wire harness connector

      (to ECM)


  3. Click here

    INSPECT NO. 1 INTEGRATION RELAY (EFI MAIN RELAY)


    1. Inspect the No. 1 integration relay (EFI MAIN relay) (Click here).


  4. Click here

    CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM)


    1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

    2. Disconnect the ECM connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1C-9 - A22-2 (+B) Always Below 1 Ω
      1C-10 - A22-3 (+B2) Always Below 1 Ω
      1C-7 - A22-46 (MREL) Always Below 1 Ω
      1C-9 or A22-2 (+B) - Body ground Always 10 kΩ or higher
      1C-10 or A22-3 (+B2) - Body ground Always 10 kΩ or higher
      1C-7 or A22-46 (MREL) - Body ground Always 10 kΩ or higher

    • OKClick here
    • NG

      REPAIR OR REPLACE HARNESS OR CONNECTOR

  5. Click here

    CHECK TERMINAL VOLTAGE (POWER SOURCE OF NO. 1 INTEGRATION RELAY)


    1. A00062CE02

      Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Condition Specified Condition
      1B-1 - Body ground Always 11 to 14 V
      Table 2. Text in Illustration
      *a

      Front view of wire harness connector

      (to No. 1 Integration Relay)


    • OK

      PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)

    • NG

      REPAIR OR REPLACE HARNESS OR CONNECTOR (AUXILIARY BATTERY - NO. 1 INTEGRATION RELAY)

  6. Click here

    INSPECT NO. 1 INTEGRATION RELAY (IG2 RELAY)


    1. Inspect the No. 1 integration relay (IG2 relay) (Click here).


  7. Click here

    CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM)


    1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

    2. Disconnect the ECM connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1C-1 - A22-37 (IGSW) Always Below 1 Ω
      1C-1 or A22-37 (IGSW) - Body ground Always 10 kΩ or higher

    • OKClick here
    • NG

      REPAIR OR REPLACE HARNESS OR CONNECTOR

  8. Click here

    CHECK TERMINAL VOLTAGE (POWER SOURCE OF NO. 1 INTEGRATION RELAY)


    1. A0005BLE03

      Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Condition Specified Condition
      1D-3 - Body ground Always 11 to 14 V
      Table 3. Text in Illustration
      *a

      Front view of wire harness connector

      (to No. 1 Integration Relay)


    • OKClick here
    • NG

      REPAIR OR REPLACE HARNESS OR CONNECTOR (AUXILIARY BATTERY - NO. 1 INTEGRATION RELAY)

  9. Click here

    CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - BODY GROUND)


    1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1E-2 - Body ground Always Below 1 Ω

    • OKClick here
    • NG

      REPAIR OR REPLACE HARNESS OR CONNECTOR

  10. Click here

    CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU - NO. 1 INTEGRATION RELAY)


    1. Disconnect the certification ECU (smart key ECU assembly) connector.

    2. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      A72-9 (IG2D) - 1C-8 Always Below 1 Ω
      A72-9 (IG2D) or 1C-8 - Body ground Always 10 kΩ or higher

    • OK

      GO TO SMART ENTRY AND START SYSTEM (Click here)

    • NG

      REPAIR OR REPLACE HARNESS OR CONNECTOR