INTAKE MANIFOLD INSTALLATION

PROCEDURE


  1. SET INTAKE MANIFOLD


    1. Install the fuel vapor feed hose to the intake manifold.

    2. Install the vacuum hose to the intake manifold.

    3. Install the wire harness clamp bracket with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    4. Install a new gasket to the intake manifold.

    5. Set the intake manifold on the engine assembly.

  2. INSTALL FUEL DELIVERY PIPE

    Click here

  3. CONNECT FUEL TUBE SUB-ASSEMBLY

    Click here

  4. INSTALL INTAKE MANIFOLD


    1. Temporarily install the intake manifold with the 6 bolts.

    2. A00099OE03

      Tighten the 6 bolts in the order shown in the illustration.

      Torque:
      28 N*m  { 286 kgf*cm, 21 ft.*lbf }
    3. Connect the 6 wire harness clamps.

    4. Connect the heated oxygen sensor connector.

    5. Connect the No. 2 ventilation hose to the intake manifold.

  5. INSTALL MANIFOLD ABSOLUTE PRESSURE SENSOR

    Click here

  6. INSTALL INTAKE FLANGE


    1. Install a new gasket to the intake manifold.

    2. Install the intake flange with the 4 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  7. INSTALL FRONT OUTER COWL TOP PANEL SUB-ASSEMBLY

    Click here

  8. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY

    Click here

  9. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY

    Click here

  10. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

  11. INSTALL LUGGAGE TRIM SERVICE HOLE COVER

    Click here

  12. INSPECT FOR FUEL LEAK

    Click here