BATTERY BLOWER INSTALLATION

PROCEDURE


  1. INSTALL BATTERY COOLING BLOWER ASSEMBLY

    Note


    • Be sure not to touch the fan part of the battery cooling blower assembly.

    • Do not lift the battery cooling blower assembly using the wire harness.


    1. Install the battery cooling blower assembly to the HV battery with the 3 nuts.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
    2. Connect the connector to the battery cooling blower assembly.

  2. INSTALL NO. 2 HYBRID BATTERY INTAKE DUCT


    1. Engage the 2 claws to install the No. 2 hybrid battery intake duct to the battery cooling blower assembly.

    2. Install the clip.

      Note

      Ensure that the No. 2 hybrid battery intake duct is installed securely.

  3. INSTALL NO. 2 HYBRID VEHICLE BATTERY UPPER COVER BRACKET


    1. Install the No. 2 hybrid veicle battery upper cover bracket with the 2 nuts.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
  4. INSTALL NO. 1 HYBRID BATTERY INTAKE DUCT


    1. Install the No. 1 hybrid battery intake duct with the 3 clips.

      Note

      Ensure that the No. 1 hybrid battery intake duct is installed securely.

  5. INSTALL ROOM PARTITION PANEL INSULATOR

    Click here

  6. INSTALL REAR SEAT SIDE GARNISH LH

    Click here

  7. INSTALL REAR DOOR SCUFF PLATE LH

    Click here

  8. INSTALL REAR SEAT ASSEMBLY

    Click here

  9. INSTALL LUGGAGE COMPARTMENT FRONT TRIM COVER

    Click here

  10. INSTALL LUGGAGE COMPARTMENT FLOOR MAT

    Click here