Click here

BATTERY BLOWER INSTALLATION

Click here
Click here

PROCEDURE


  1. Click here

    INSTALL BATTERY COOLING BLOWER ASSEMBLY

    Note:
    • Be sure not to touch the fan part of the battery cooling blower assembly.

    • Do not lift the battery cooling blower assembly using the wire harness.


    1. Install the battery cooling blower assembly to the HV battery with the 3 nuts.

      7.5 N*m 76 kgf*cm 66 in.*lbf
    2. Connect the connector to the battery cooling blower assembly.

  2. Click here

    INSTALL NO. 2 HYBRID BATTERY INTAKE DUCT


    1. Engage the 2 claws to install the No. 2 hybrid battery intake duct to the battery cooling blower assembly.

    2. Install the clip.

      Note:

      Ensure that the No. 2 hybrid battery intake duct is installed securely.

  3. Click here

    INSTALL NO. 2 HYBRID VEHICLE BATTERY UPPER COVER BRACKET


    1. Install the No. 2 hybrid vehicle battery upper cover bracket with the 2 nuts.

      7.5 N*m 76 kgf*cm 66 in.*lbf
  4. Click here

    INSTALL NO. 1 HYBRID BATTERY INTAKE DUCT


    1. Install the No. 1 hybrid battery intake duct with the 3 clips.

      Note:

      Ensure that the No. 1 hybrid battery intake duct is installed securely.

  5. Click here

    INSTALL ROOM PARTITION PANEL INSULATOR

    Click here

  6. Click here

    INSTALL REAR SEAT SIDE GARNISH LH

    Click here

  7. Click here

    INSTALL REAR DOOR SCUFF PLATE LH

    Click here

  8. Click here

    INSTALL REAR SEAT ASSEMBLY

    (Click here)

  9. Click here

    INSTALL LUGGAGE COMPARTMENT FRONT TRIM COVER

    Click here

  10. Click here

    INSTALL LUGGAGE COMPARTMENT FLOOR MAT

    Click here