NETWORK GATEWAY ECU(for RHD) INSTALLATION

CAUTION / NOTICE / HINT

PROCEDURE


  1. INSTALL CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)


    1. Engage the claws to install the central gateway ECU (network gateway ECU).

      A001U2G

      Note

      Make sure that the central gateway ECU (network gateway ECU) is securely installed.

  2. INSTALL ECU INTEGRATION BOX LH


    1. Install the ECU integration box LH with the bolt and nut.

    2. Connect the connector.

    3. w/ Stop and Start System:


      1. Connect the 3 connectors.

    4. A001XHW

      Connect the 5 connectors as shown in the illustration.

  3. INSTALL NO. 2 INSTRUMENT PANEL LOWER FINISH PANEL

    Click here