GENERATOR(for VALEO Made) INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the generator assembly with the bolt and 2 nuts.

      Torque:
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }
    2. Connect the generator assembly connector.

    3. Connect the engine wire to the terminal B with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    4. Install the terminal cap.

  2. INSTALL INTERCOOLER ASSEMBLY

    Click here

  3. INSTALL FAN AND GENERATOR V BELT

    Click here

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Click here

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here