Info Added 2017-10-06
PROCEDURE
INSTALL NO. 1 INTEGRATION RELAY
Connect the 2 connectors.
|
Install in this Direction |
Engage the claws to install the No. 1 integration relay as shown in the illustration.
INSTALL NO. 1 RELAY BLOCK COVER
|
Install in this Direction |
Engage the claws to install the No. 1 relay block cover as shown in the illustration.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
for 8NR-FTS:
for 3ZR-FAE:
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.