PROCEDURE
INSTALL BRAKE BOOSTER GASKET
Install a new brake booster gasket to the brake booster assembly.
INSTALL BRAKE BOOSTER ASSEMBLY
Temporarily install the brake booster assembly to the vehicle body.
Note
Do not apply excessive force to the brake lines or refrigerant lines.
Temporarily install the clevis lock nut and brake master cylinder push rod clevis to the brake booster assembly.
Note
Fully tighten the clevis lock nut when adjusting the brake pedal height.
Install the 4 nuts to secure the brake booster assembly.
Note
Tighten the 4 nuts in the order shown in the illustration.
Remove the protective tape.
Engage the 2 clamps to install the fuel pipe to the fuel pipe clamp.
Engage the clamp to install a new No. 2 brake tube clamp to the vehicle body.
Engage the 5 clamps to install the No. 2 brake tube clamp to the brake tubes.
Engage the 5 clamps to install a new No. 1 brake tube clamp to the brake tubes.
w/ Stop and Start System:
Connect the vacuum sensor connector.
w/ Vacuum Warning Switch:
Connect the vacuum warning switch connector.
CONNECT CHECK VALVE TO CONNECTOR TUBE HOSE
Connect the check valve to connector tube hose to the brake booster assembly and slide the clip to secure it.
INSTALL DASH PANEL HEAT INSULATOR
Temporarily install dash panel heat insulator to the vehicle body with the 2 nuts (A).
Install the nut (B).
Tighten the 2 nuts (A).
INSTALL NO. 1 ENGINE UNDER COVER
INSTALL PUSH ROD PIN
INSTALL BRAKE PEDAL RETURN SPRING
INSTALL BRAKE MASTER CYLINDER SUB-ASSEMBLY
INSPECT AND ADJUST BRAKE PEDAL