PROCEDURE
INSTALL PARK/NEUTRAL POSITION SWITCH
Temporarily install the park/neutral position switch to the continuously variable transaxle assembly with the 2 bolts.
Install the lock plate and lock nut to the park/neutral position switch.
Temporarily install the control shaft lever to the park/neutral position switch.
Turn the control shaft lever clockwise until it stops, then turn it counterclockwise 2 notches.
Remove the control shaft lever from the park/neutral position switch.
| *a | Neutral Basic Line |
| *b | Protrusion |
Align the protrusion with the neutral basic line.
Hold the park/neutral position switch in that position and tighten the 2 bolts.
Using a screwdriver, stake the lock nut with the lock plate.
Install the control shaft lever to the park/neutral position switch with the washer and nut.
Connect the park/neutral position switch connector.
CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Connect the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.
| *a | P Position |
| *b | N Position |
Turn the control shaft lever clockwise until it stops, then turn it counterclockwise 2 notches.
Connect the transmission control cable assembly to the control shaft lever with the nut.
INSPECT SHIFT LEVER POSITION
ADJUST SHIFT LEVER POSITION
INSPECT PARK/NEUTRAL POSITION SWITCH OPERATION
ADJUST PARK/NEUTRAL POSITION SWITCH
INSTALL AIR CLEANER CASE SUB-ASSEMBLY
INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
INSTALL NO. 1 AIR CLEANER INLET
INSTALL RADIATOR COVER
INSTALL NO. 2 CYLINDER HEAD COVER
INSTALL REAR ENGINE UNDER COVER LH
INSTALL NO. 1 ENGINE UNDER COVER