VACUUM REGULATING VALVE INSTALLATION

PROCEDURE


  1. INSTALL VACUUM REGULATING VALVE ASSEMBLY


    1. Install the vacuum regulating valve assembly to the No. 2 vacuum switching valve bracket with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the No. 2 vacuum transmitting hose and No. 3 vacuum transmitting hose to the vacuum regulating valve assembly.

    3. Connect the vacuum regulating valve assembly connector.

  2. INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY (for LHD)

    Click here

  3. INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY (for RHD)

    Click here

  4. INSTALL COWL BODY MOUNTING REINFORCEMENT RH

    Click here

  5. INSTALL COWL BODY MOUNTING REINFORCEMENT LH

    Click here

  6. INSTALL WATER GUARD PLATE LH

    Click here

  7. INSTALL NO. 1 HEATER AIR DUCT SPLASH SHIELD SEAL

    Click here

  8. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY

    Click here