HIGH PRESSURE MAGNETIC VALVE INSTALLATION

PROCEDURE


  1. INSTALL HIGH PRESSURE MAGNETIC VALVE


    1. Remove the vinyl tape from the high pressure magnetic valve.

    2. Sufficiently apply compressor oil to a new O-ring and the fitting surface of the valve to connector tube.

      Compressor Oil
      ND-OIL 11 or equivalent
    3. Install the O-ring to the valve to connector tube.

      Note

      Keep the O-ring and O-ring fitting surface free of foreign matter.

    4. A003LOXC02
      *a Reference Point

      Using a 5 mm hexagon socket wrench, install the high pressure magnetic valve with the hexagon bolt.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }

      Note

      Make sure to install the high pressure magnetic valve with the arrow facing the direction shown in the illustration.

    5. Remove the vinyl tape from the valve to connector tube.

    6. Sufficiently apply compressor oil to a new O-ring and the fitting surface of the valve to connector tube.

      Compressor Oil
      ND-OIL 11 or equivalent
    7. Install the O-ring to the valve to connector tube.

      Note

      Keep the O-ring and O-ring fitting surface free of foreign matter.

    8. Install the high pressure magnetic valve with connector tube with the bolt.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
  2. INSTALL COOLER REFRIGERANT LIQUID PIPE A

    Click here

  3. INSTALL NO. 1 RECEIVER TANK BRACKET WITH NO. 5 COOLER BRACKET

    Click here

  4. INSTALL NO. 6 COOLER BRACKET

    Click here

  5. INSTALL AIR CONDITIONING RECEIVER TANK WITH BRACKET

    Click here

  6. INSTALL NO. 3 RECEIVER TANK BRACKET

    Click here

  7. INSTALL ACCUMULATOR AND ACCESSORY ASSEMBLY

    Click here