INITIALIZE THE CONNECTION INFORMATION OF A GATEWAY FUNCTION EQUIPPED ECU (BUS MONITOR ECU)
Connect the GTS to the DLC3.
Turn the power switch on (IG).
Turn the GTS on.
Enter the following menus:
for Body Electrical / Central Gateway / Utility / Initialization
| Tester Display |
|---|
| Initialization |
for Body Electrical / Main Body / Utility / Initialization
| Tester Display |
|---|
| Initialization |
Initialize the ECU.