| DTC Code | DTC Name |
|---|---|
| P1EC700 | Solar Charging Battery Cell Low Voltage |
DESCRIPTION
Refer to the description for DTC P1EC000.
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | Warning Indicate |
|---|---|---|---|---|
| P1EC700 | Solar Charging Battery Cell Low Voltage | The difference in voltage between each solar battery block is exceeds the specified value due to an internal malfunction of the solar battery. (2 trip detection logic) |
|
Solar Charging Warning Light: Comes on |
| DTC No. | Data List |
|---|---|
| P1EC700 |
|
| Data List | Voltage |
|---|---|
| Solar Charging Battery Block 1 Voltage | Approximately 8.2 V |
| Solar Charging Battery Block 2 Voltage | Approximately 8.2 V |
| Solar Charging Battery Block 3 Voltage | Approximately 8.2 V |
| Solar Charging Battery Block 1 Voltage Sensor Upper Side Voltage | Approximately 4.1 V |
| Solar Charging Battery Block 1 Voltage Sensor Under Side Voltage | approximately 4.1 V |
| Solar Charging Battery Block 2 Voltage Sensor Upper Side Voltage | Approximately 2.7 V |
| Solar Charging Battery Block 2 Voltage Sensor Middle Side Voltage | Approximately 2.7 V |
| Solar Charging Battery Block 2 Voltage Sensor Under Side Voltage | Approximately 2.7 V |
| Solar Charging Battery Block 3 Voltage Sensor Upper Side Voltage | Approximately 4.1 V |
| Solar Charging Battery Block 3 Voltage Sensor Under Side Voltage | Approximately 4.1 V |
| Solar Charging Battery Charging and Discharging Voltage | Approximately 24.5 V |
| Solar Charging Battery Block Total Voltage | Approximately 24.5 V |
CONFIRMATION DRIVING PATTERN
Tech Tips
After completing repairs, clear the DTCs and then check that the vehicle has returned to normal by performing the following All Readiness check procedure.
Park the vehicle in an area where the solar radiation will be steady.
| Weather | Clear or mostly clear and sunny |
| Time | Between 11:00 and 14:00 |
| Place | An area where sunlight strikes the solar roof directly |
Tech Tips
Make sure no part of the solar roof is shaded.
If the solar roof is dirty, clean it.
Turn the power switch off and then disconnect the cable from the negative (-) auxiliary battery terminal.
Wait for 5 seconds or more, then disconnect the power source connector and then all other low voltage connectors the solar energy control unit.
Wait for 30 seconds or more, then connect the low voltage connectors of the solar energy control unit except the power source connector and then connect the power source connector.
Connect the cable to the negative (-) auxiliary battery terminal.
Turn the power switch on (IG), wait for 5 to 10 seconds, and then turn the power switch off.
Tech Tips
Make sure to turn the power switch off within 10 seconds.
Wait for 20 minutes and then check for DTCs to check that no DTCs have been stored.
Tech Tips
While waiting, the HV battery will be charged by the solar charging system. However, depending on certain conditions, charging may not be performed.
If the SOC of the HV battery is 90% or more, the HV battery will not be charged by the solar charging system.
If any of the following conditions is met, the HV battery will not be charged by the solar charging system:
The HV battery is charged via an external power source.
The power switch is on (ACC).
The power switch is on (IG).
The power switch is on (READY).
The HV battery heating system is operating.
The remote air conditioning system is operating.
CAUTION / NOTICE / HINT
CAUTION:
Before performing any of the following operations, take precautions to prevent electric shock by turning the power switch off, wearing insulated gloves, and removing the service plug grip.
Inspecting the high-voltage system.
Disconnecting the low voltage connector of the inverter with converter assembly.
Disconnecting the low voltage connector of the HV battery.
Disconnecting the low voltage connector of the electric vehicle charger assembly.
Disconnecting the low voltage connector of the solar energy control unit.
To prevent electric shock, make sure to remove the service plug grip to cut off the high voltage circuit before servicing the vehicle.
After removing the service plug grip from the HV battery, put it in your pocket to prevent other technicians from accidentally reconnecting it while you are working on the high-voltage system.
| *a | Without waiting for 10 minutes |
After removing the service plug grip, wait for at least 10 minutes before touching any of the high-voltage connectors or terminals. After waiting for 10 minutes, check the voltage at the terminals in the inspection point in the inverter with converter assembly. The voltage should be 0 V before beginning work.
Tech Tips
Waiting for at least 10 minutes is required to discharge the high-voltage capacitor inside the inverter with converter assembly.
Note
After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) auxiliary battery terminal notices before proceeding with work.
PROCEDURE
CHECK DTC OUTPUT (SOLAR CHARGING SYSTEM)
Connect the GTS to the DLC3.
Turn the power switch on (IG).
Enter the following menus: Powertrain / Solar Charging Control / Trouble Codes.
Check for DTCs.
| Result | ||||||
|---|---|---|---|---|---|---|
|
| Relevant DTC | |
|---|---|
| P1ECD16 | Solar Charging Battery Control System Circuit Voltage Below Threshold |
| P1ECF87 | Lost Communication with Internal Control Module Solar Charger Battery Monitor Missing Message |
| P1ED462 | Solar Charging Battery Voltage Sensor Signal Compare Failure |
| P1EDD13 | Solar Charging Battery Voltage Sensor "A" Circuit Open |
| P1EE213 | Solar Charging Battery Voltage Sensor "B" Circuit Open |
| P1EE713 | Solar Charging Battery Voltage Sensor "C" Circuit Open |
Turn the power switch off.
| B |
|
GO TO DTC CHART (SOLAR CHARGING SYSTEM) Click here |
| A |
|
CHECK HARNESS AND CONNECTOR (SOLAR ENERGY CONTROL UNIT - SOLAR BATTERY)
| Result | |||
|---|---|---|---|
|
CAUTION:
Be sure to wear insulated gloves.
Check that the service plug grip is not installed.
Note
After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.
Remove the rear seat cushion assembly LH.
Disconnect the N73 solar energy control unit connector.
Disconnect the N71 and N72 solar energy control unit connectors.
Remove the No. 1 solar battery shield panel.
Disconnect the N70 solar battery connector.
Measure the resistance according to the value(s) in the table below.
| *a | Rear view of wire harness connector (to Solar Energy Control Unit) |
*b | Rear view of wire harness connector (to Solar Battery) |
| Standard Resistance (Check for Open) | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Standard Resistance (Check for Short) | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Reconnect the N70 solar battery connector.
Install the No. 1 solar battery shield panel.
Reconnect the N71 and N72 solar energy control unit connectors.
Reconnect the N73 solar energy control unit connector.
Install the rear seat cushion assembly LH.
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (SOLAR ENERGY CONTROL UNIT - SOLAR BATTERY)
| Result | |||
|---|---|---|---|
|
CAUTION:
Be sure to wear insulated gloves.
Check that the service plug grip is not installed.
Note
After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.
Remove the rear seat cushion assembly LH.
Disconnect the N73 solar energy control unit connector.
Disconnect the N71 and N72 solar energy control unit connectors.
Remove the No. 1 solar battery shield panel.
Disconnect the N70 solar battery connector.
Connect the cable to the negative (-) auxiliary battery terminal.
Turn the power switch on (IG).
Measure the voltage according to the value(s) in the table below.
| *a | Rear view of wire harness connector (to solar energy control unit) |
*b | Rear view of wire harness connector (to Solar Battery) |
| Standard Voltage | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Note
Turning the power switch on (IG) with the service plug grip removed causes other DTCs to be stored. Clear the DTCs after performing this inspection.
If the power switch is turned on (IG) with the connectors disconnected, other DTCs will be stored. Be sure to clear the DTCs after the inspection.
Turn the power switch off.
Disconnect the cable from the negative (-) auxiliary battery terminal.
Reconnect the N70 solar battery connector.
Install the No. 1 solar battery shield panel.
Reconnect the N71 and N72 solar energy control unit connectors.
Reconnect the N73 solar energy control unit connector.
Install the rear seat cushion assembly LH.
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR Click here |
| OK |
|
CHECK SOLAR ENERGY CONTROL UNIT (+B SHORT)
| Result | |||
|---|---|---|---|
|
Remove the No. 1 solar battery shield panel.
Connect the cable to the negative (-) auxiliary battery terminal.
Disconnect the N70 solar battery connector.
Turn the power switch on (IG).
| *a | Rear view of wire harness connector (to Solar Battery) |
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Note
Turning the power switch on (IG) with the service plug grip removed causes other DTCs to be stored. Clear the DTCs after performing this inspection.
If the power switch is turned on (IG) with the connectors disconnected, other DTCs will be stored. Be sure to clear the DTCs after the inspection.
Turn the power switch off.
Disconnect the cable from the negative (-) auxiliary battery terminal.
Reconnect the N70 solar battery connector.
Install the No. 1 solar battery shield panel.
| Result | |||
|---|---|---|---|
|
| NG |
|
REPLACE SOLAR ENERGY CONTROL UNIT Click here |
| OK |
|
CHECK SOLAR ENERGY CONTROL UNIT (VOLTAGE SENSOR)
| Result | |||
|---|---|---|---|
|
CAUTION:
Be sure to wear insulated gloves.
Check that the service plug grip is not installed.
Note
After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.
Remove the rear seat cushion assembly LH.
Connect the GTS to the DLC3.
Turn the power switch on (IG).
Enter the following menus: Powertrain / Solar Charging Control / Data List.
| Tester Display |
|---|
| Solar Charging Battery Charging and Discharging Voltage |
| Solar Charging Battery Block Total Voltage |
| Solar Charging Battery Block 1 Voltage |
| Solar Charging Battery Block 2 Voltage |
| Solar Charging Battery Block 3 Voltage |
| Solar Charging Battery Block 1 Voltage Sensor Upper Side Voltage |
| Solar Charging Battery Block 1 Voltage Sensor Under Side Voltage |
| Solar Charging Battery Block 2 Voltage Sensor Upper Side Voltage |
| Solar Charging Battery Block 2 Voltage Sensor Middle Side Voltage |
| Solar Charging Battery Block 2 Voltage Sensor Under Side Voltage |
| Solar Charging Battery Block 3 Voltage Sensor Upper Side Voltage |
| Solar Charging Battery Block 3 Voltage Sensor Under Side Voltage |
Note
Turning the power switch on (IG) with the service plug grip removed causes other DTCs to be stored. Clear the DTCs after performing this inspection.
If the power switch is turned on (IG) with the connectors disconnected, ]other DTCs will be stored. Be sure to clear the DTCs after the inspection.
According to the display on the GTS, read the Data List.
Turn the power switch off.
Disconnect the N71 and N72 solar energy control unit connectors.
Disconnect the N73 solar energy control unit connector.
Compare the Data List values with those shown in the following combination table.
| *a | Rear view of wire harness connector (to Solar Energy Control Unit) |
- | - |
| Specified Condition | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Condition (All of the following conditions are met.) |
|---|
| "Solar Charging Battery Block 1 Voltage Sensor Upper Side Voltage" - "Solar Charging Battery Block 1 Voltage Sensor Under Side Voltage" = 0.2 V or less |
| "Solar Charging Battery Block 2 Voltage Sensor Upper Side Voltage" - "Solar Charging Battery Block 2 Voltage Sensor Middle Side Voltage" = 0.2 V or less |
| "Solar Charging Battery Block 2 Voltage Sensor Middle Side Voltage" - "Solar Charging Battery Block 2 Voltage Sensor Under Side Voltage" = 0.2 V or less |
| "Solar Charging Battery Block 2 Voltage Sensor Upper Side Voltage" - "Solar Charging Battery Block 2 Voltage Sensor Under Side Voltage" = 0.2 V or less |
| "Solar Charging Battery Block 3 Voltage Sensor Upper Side Voltage" - "Solar Charging Battery Block 3 Voltage Sensor Under Side Voltage" = 0.2 V or less |
| "Solar Charging Battery Charging and Discharging Voltage" - "Solar Charging Battery Block Total Voltage" = 0.2 V or less |
Reconnect the N71 and N72 solar energy control unit connectors.
Reconnect the N73 solar energy control unit connector.
Install the rear seat cushion assembly LH.
| Result | |||
|---|---|---|---|
|
| OK |
|
REPLACE SOLAR BATTERY Click here |
| NG |
|
REPLACE SOLAR ENERGY CONTROL UNIT Click here |
REPAIR OR REPLACE HARNESS OR CONNECTOR
| Result | ||
|---|---|---|
|
| NEXT |
|
CHECK SOLAR BATTERY (INTERNAL BLOCK VOLTAGE)
| Result | ||||||
|---|---|---|---|---|---|---|
|
CAUTION:
Be sure to wear insulated gloves.
Check that the service plug grip is not installed.
Note
After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.
Remove the rear seat cushion assembly LH.
Disconnect the N73 solar energy control unit connector.
Disconnect the N71 and N72 solar energy control unit connectors.
Measure the voltage according to the value(s) in the table below.
| *a | Rear view of wire harness connector (to Solar Energy Control Unit) |
- | - |
| Standard Voltage | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Reconnect the N71 and N72 solar energy control unit connectors.
Reconnect the N73 solar energy control unit connector.
Install the rear seat cushion assembly LH.
| Result | ||||||
|---|---|---|---|---|---|---|
|
| A |
|
REPLACE SOLAR BATTERY Click here |
| B |
|
END |
REPLACE SOLAR ENERGY CONTROL UNIT
| Result | ||
|---|---|---|
|
| NEXT |
|
CHECK SOLAR BATTERY (INTERNAL BLOCK VOLTAGE)
| Result | ||||||
|---|---|---|---|---|---|---|
|
CAUTION:
Be sure to wear insulated gloves.
Check that the service plug grip is not installed.
Note
After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.
Remove the rear seat cushion assembly LH.
Disconnect the N73 solar energy control unit connector.
Disconnect the N71 and N72 solar energy control unit connectors.
Measure the voltage according to the value(s) in the table below.
| *a | Rear view of wire harness connector (to Solar Energy Control Unit) |
- | - |
| Standard Voltage | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Reconnect the N71 and N72 solar energy control unit connectors.
Reconnect the N73 solar energy control unit connector.
Install the rear seat cushion assembly LH.
| Result | ||||||
|---|---|---|---|---|---|---|
|
| A |
|
REPLACE SOLAR BATTERY Click here |
| B |
|
END |