FUSE BOX INSTALLATION

PROCEDURE


  1. INSTALL HYBRID BATTERY TERMINAL BLOCK

    CAUTION:

    Be sure to wear insulated gloves and protective goggles.


    1. Install the hybrid battery terminal block to the HV battery with the nut.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
    2. Connect the 2 hybrid battery terminal block connectors.

      Note

      Make sure that the connectors are connected securely.

  2. INSTALL UPPER HYBRID BATTERY COVER SUB-ASSEMBLY

    Click here

  3. PERFORM HIGH VOLTAGE FUSE ACCUMULATED LOAD HISTORY RESET

    Click here