CHARGE INDICATOR INSTALLATION

PROCEDURE


  1. INSTALL EV CHARGER LID INDICATOR ASSEMBLY


    1. Install the EV charger lid indicator assembly to the battery charger connector opening lid sub-assembly with the 2 bolts.

      Torque:
      2.0 N*m  { 20 kgf*cm, 18 in.*lbf }
  2. INSTALL FUEL FILLER OPENING LID LOCK BRACKET

    Click here