AIR CONDITIONING PANEL INSTALLATION

PROCEDURE


  1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY


    1. A01MHAQC01
      *a guide
      *b Clamp

      Connect the 2 connectors.

    2. Disengage the guide and clamps.

    3. A01MJ2R

      Align the positions of the claws and the clips, and temporarily install the integration control panel assembly.

    4. A01MIA6C01
      B006JDZ Place Hands Here
      B006JFV Install in this Direction

      Press inward in the direction shown by the arrows in the illustration, engage the claws and the clips, and install the integration and panel assembly.

      Tech Tips

      Check that the claw at the position shown in the illustration is engaged, and if it is raised up or not properly engaged, press the claw portion inward to engage it.

      A01MH7P
    5. Remove the protective tape.