PROCEDURE
INSTALL NO. 2 ANTENNA CORD SUB-ASSEMBLY
Engage the clamps for roof panel side and install the No. 2 antenna cord sub-assembly.
Connect the 2 connectors.
Engage the clamps to install the pillar side.
INSTALL ROOF HEADLINING ASSEMBLY
INSTALL ANTENNA CORD SUB-ASSEMBLY
Engage the clamps to install the antenna cord sub-assembly.
INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT
INSTALL NO. 3 HEATER TO REGISTER DUCT
INSTALL UPPER INSTRUMENT PANEL SUB-ASSEMBLY