ANTENNA CORD INSTALLATION

PROCEDURE


  1. INSTALL NO. 2 ANTENNA CORD SUB-ASSEMBLY


    1. Engage the clamps for roof panel side and install the No. 2 antenna cord sub-assembly.

      A01MH5P
    2. Connect the 2 connectors.

    3. A01MGXI

      Engage the clamps to install the pillar side.

  2. INSTALL ROOF HEADLINING ASSEMBLY

    Click here

  3. INSTALL ANTENNA CORD SUB-ASSEMBLY


    1. Engage the clamps to install the antenna cord sub-assembly.

      A01MG5R
  4. INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT

    Click here

  5. INSTALL NO. 3 HEATER TO REGISTER DUCT

    Click here

  6. INSTALL UPPER INSTRUMENT PANEL SUB-ASSEMBLY

    Click here