BATTERY COOLING DUCT INSTALLATION

PROCEDURE


  1. INSTALL NO. 2 EV BATTERY INTAKE DUCT

    CAUTION:

    Wear insulated gloves.


    1. Engage the 2 claws and install the No. 2 EV battery intake duct to the battery cooling blower assembly.

    2. Install the clip.

  2. INSTALL NO. 2 EV BATTERY UPPER COVER BRACKET

    CAUTION:

    Wear insulated gloves.


    1. Install the No. 2 EV battery upper cover bracket to the No. 2 EV battery intake duct and EV battery with the 2 nuts.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
  3. INSTALL NO. 1 EV BATTERY INTAKE DUCT

    CAUTION:

    Wear insulated gloves.


    1. Install the No. 1 EV battery intake duct to the battery cooling blower assembly and vehicle with the 3 clips.

  4. INSTALL REAR SEAT SIDE GARNISH LH

    Click here

  5. INSTALL REAR DOOR OPENING TRIM WEATHERSTRIP LH

    Click here

  6. INSTALL REAR DOOR SCUFF PLATE LH

    Click here

  7. INSTALL REAR SEAT ASSEMBLY

    Click here

  8. INSTALL INVERTER COVER

    Click here

  9. INSTALL FC STACK SERVICE PLUG GRIP

    Click here

  10. INSTALL SERVICE PLUG GRIP (for EV)

    Click here