BATTERY BLOWER INSTALLATION

PROCEDURE


  1. INSTALL BATTERY COOLING BLOWER ASSEMBLY

    CAUTION:

    Wear insulated gloves.


    1. Install the battery cooling blower assembly to the EV battery with the 3 nuts.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }

      Note


      • Be sure not to touch the fan part of the battery cooling blower assembly.

      • Do not lift the battery cooling blower assembly using the wire harness.

    2. Connect the battery cooling blower assembly connector.

  2. INSTALL EV BATTERY COOLING DUCT

    Click here

  3. INSTALL INVERTER COVER

    Click here

  4. INSTALL FC STACK SERVICE PLUG GRIP

    Click here

  5. INSTALL SERVICE PLUG GRIP (for EV)

    Click here