NETWORK GATEWAY ECU INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips


  • Use the same procedure for RHD and LHD vehicles.

  • The procedure listed below is for LHD vehicles.

PROCEDURE


  1. INSTALL NETWORK GATEWAY ECU


    1. Install the network gateway ECU with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    2. Connect the connector.

  2. INSTALL HEADLIGHT LEVELING ECU ASSEMBLY (for RHD, w/ LED Headlight)

    Click here

  3. INSTALL LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY

    Click here

  4. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  5. INSTALL LOWER STEERING COLUMN COVER

    Click here

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  7. PERFORM DIAGNOSTIC SYSTEM CHECK

    Click here

  8. CHECK SRS WARNING LIGHT

    Click here