PROCEDURE
INSTALL GENERATOR ASSEMBLY
Install the generator assembly with the 2 bolts.
| for bolt A | ||
| 62 N*m | 632 kgf*cm | 46 ft.*lbf |
| for bolt B | ||
| 25 N*m | 255 kgf*cm | 18 ft.*lbf |
Connect the generator connector.
Install the generator wire with the nut to terminal B.
| 9.8 N*m | 100 kgf*cm | 87 in.*lbf |
INSTALL NO. 2 IDLER PULLEY ASSEMBLY
Install the spacer, No. 2 idle pulley assembly and 2 pulley plates with the bolt.
| 45 N*m | 459 kgf*cm | 33 ft.*lbf |
INSTALL FAN AND GENERATOR V BELT
INSTALL AIR CLEANER CASE SUB-ASSEMBLY
INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH AIR CLEANER HOSE
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.