PROCEDURE
INSTALL GENERATOR ASSEMBLY
Install the 2 generator brackets with the 2 bolts.
| 8.4 N*m | 86 kgf*cm | 74 in.*lbf |
Install the generator assembly with the 2 bolts.
| 43 N*m | 438 kgf*cm | 32 ft.*lbf |
Attach the 3 clamps and connect the wire harness.
Connect the wire harness to terminal B with the nut.
| 9.8 N*m | 100 kgf*cm | 87 in.*lbf |
Install the terminal cap.
Connect the generator connector and attach the clamp.
Connect the intake air temperature sensor connector.
INSTALL FAN AND GENERATOR V BELT
INSTALL NO. 4 AIR HOSE
INSTALL BATTERY TRAY
INSTALL BATTERY
INSTALL BATTERY CLAMP SUB-ASSEMBLY
Install the battery clamp sub-assembly with the 2 nuts and 2 battery clamp bolts.
| 5.4 N*m | 55 kgf*cm | 48 in.*lbf |
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.