Click here

PROPELLER SHAFT ASSEMBLY(for TMT Made) INSPECTION

Click here
Click here Click here

PROCEDURE


  1. Click here

    INSPECT PROPELLER SHAFT AND INTERMEDIATE SHAFT


    1. Using a dial indicator, measure the propeller shaft and intermediate shaft runout.

      Maximum Runout
      Item Specified Condition
      Propeller shaft 0.3 mm (0.0118 in.)
      Intermediate shaft 0.3 mm (0.0118 in.)

      If the shaft runout is more than the maximum, replace the shaft.

  2. Click here

    INSPECT SPIDER


    1. Check the spider bearings for wear or damage.

    2. A01SALM

      Check the axial play of each spider bearing by turning the yoke while holding the shaft tightly.

      Maximum bearing axial play
      0.05 mm (0.00196 in.)

      If the bearing axial play is more than the maximum, replace the spider bearing.

  3. Click here

    INSPECT CENTER NO. 1 SUPPORT BEARING ASSEMBLY


    1. While turning the center No. 1 support bearing assembly by hand, check that it turns smoothly without catching and that there are no cracks or damage.

      If there are any defects, replace the bearing.

      If there is any damage to the lip of the center No. 1 support bearing assembly case, replace the bearing.