VACUUM SWITCHING VALVE(for 1TR-FE, 2TR-FE) INSTALLATION

PROCEDURE


  1. INSTALL VACUUM SWITCHING VALVE BRACKET (for LHD)


    1. Install the vacuum switching valve bracket with the 2 nuts.

      Torque:
      6.4 N*m  { 65 kgf*cm, 57 in.*lbf }
  2. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for LHD)


    1. Install the No. 1 vacuum switching valve assembly with the nut.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
    2. Connect the No. 1 air hose and No. 2 air hose to the No. 1 vacuum switching valve and slide the 2 clips to secure them.

    3. Connect the connector.

  3. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for RHD)


    1. Install the No. 1 vacuum switching valve assembly with the nut.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
  4. INSTALL BOOSTER VACUUM TUBE (for RHD)


    1. Install the booster vacuum tube with the 3 nuts.

      Torque:
      6.4 N*m  { 65 kgf*cm, 57 in.*lbf }
    2. Connect the No. 1 air hose and No. 2 air hose to the No. 1 vacuum switching valve and slide the 2 clips to secure them.

    3. Connect the check valve to brake booster hose and union to connector tube hose and slide the 2 clips to secure them.

    4. Connect the connector and attach the wire harness clamp.