CAUTION / NOTICE / HINT
Note
When replacing the parts in the following chart (A), replace the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly, No. 3 injection pipe sub-assembly, No. 4 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly with new ones.
| Replaced Parts (A) | Pipes Requiring New Replacement |
|---|---|
|
|
|
Fuel inlet pipe sub-assembly |
After removing the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly, No. 3 injection pipe sub-assembly, No. 4 injection pipe sub-assembly and fuel inlet pipe sub-assembly, clean them with a brush and compressed air.
PROCEDURE
INSTALL ENGINE WATER PUMP ASSEMBLY
Install a new gasket and the engine water pump assembly with the 5 bolts and 2 nuts.
INSTALL NO. 2 TIMING BELT COVER
INSTALL CAMSHAFT TIMING PULLEY
INSTALL NO. 1 TIMING BELT IDLER SUB-ASSEMBLY
INSTALL TIMING BELT
INSTALL NO. 1 TIMING BELT COVER
INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY
INSTALL NO. 1, NO. 2 AND NO. 3 INJECTION PIPE SUB-ASSEMBLY
INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
INSTALL GENERATOR BRACKET
INSTALL GENERATOR ASSEMBLY
INSTALL NO. 2 IDLE PULLEY ASSEMBLY
CONNECT COOLER COMPRESSOR ASSEMBLY (w/ Air Conditioning System)
INSTALL FAN SHROUD
INSTALL RADIATOR RESERVOIR
INSTALL OIL RESERVOIR BRACKET
CONNECT VANE PUMP OIL RESERVOIR ASSEMBLY
INSTALL NO. 1 RADIATOR HOSE
INSTALL NO. 1 INTAKE PIPE
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
BLEED AIR FROM FUEL SYSTEM
ADD ENGINE COOLANT
INSPECT FOR COOLANT LEAK
INSPECT FOR FUEL LEAK
INSPECT FOR OIL LEAK