PROCEDURE
INSTALL INTAKE MANIFOLD
Install the intake manifold insulator to the intake manifold.
Tech Tips
Insert the protrusions of the intake manifold insulator into the grille of the intake manifold.
Note
Insert the intake manifold insulator until the protrusion of the line as shown in the illustration.
Install the 2 wire harness clamp brackets to the intake manifold with the 2 bolts.
Install a new gasket to the intake manifold.
|
Bolt |
|
Nut |
Temporarily install the intake manifold with the 5 bolts and 2 nuts, and then tighten the bolts and nuts in the sequence shown in the illustration.
Install the 2 No. 2 intake manifold insulators to the intake manifold.
Install the purge line hose to the intake manifold, and slide the clip to secure the hose.
Attach the clamp.
Connect the union to connector tube hose to the intake manifold, and slide the clip to secure the hose.
Connect the No. 3 PCV hose to the intake manifold, and slide the clip to secure the hose.
Attach the No. 2 water by-pass hose.
Connect the heater water pipe sub-assembly to the intake manifold with the bolt.
Attach the No. 1 fuel hose to the intake manifold.
Attach the 4 wire harness clamps to the 2 wire harness clamp brackets.
INSTALL PURGE VSV
INSTALL FRONT FENDER SEAL LH
INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY