CANISTER INSTALLATION

PROCEDURE


  1. INSTALL CANISTER


    1. A01LF9G

      Attach the canister to the stay.

    2. Connect the vent line hose to the canister, and slide the clip to secure the hose.

    3. Connect the purge line hose to the canister, and slide the clip to secure the hose.

    4. Connect the air inlet line hose to the canister.