CANISTER INSTALLATION

PROCEDURE


  1. INSTALL CANISTER


    1. A01LG4T

      Attach the canister to the stay.

    2. Connect the vent line hose to the canister and slide the clamp to secure the hose.

    3. Connect the purge line hose to the canister and slide the clamp to secure the hose.

    4. Connect the air inlet line hose to the canister.