CAUTION / NOTICE / HINT
Note
When replacing the parts in the following chart (A), replace the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly, No. 3 injection pipe sub-assembly, No. 4 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly with new ones.
| Replaced Parts (A) | Pipes Requiring New Replacement |
|---|---|
|
|
|
Fuel inlet pipe sub-assembly |
After removing the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly, No. 3 injection pipe sub-assembly, No. 4 injection pipe sub-assembly and fuel inlet pipe sub-assembly, clean them with a brush and compressed air.
PROCEDURE
INSTALL OIL COOLER ASSEMBLY
Install 2 new gaskets to the oil cooler assembly.
Install the oil cooler assembly to the oil cooler cover sub-assembly with the 4 nuts.
INSTALL OIL COOLER COVER SUB-ASSEMBLY
Install a new gasket and the oil cooler cover sub-assembly with the 13 bolts.
Connect the No. 2 vacuum transmitting pipe sub-assembly with the 2 nuts.
Connect the connector to the engine oil pressure switch assembly.
INSTALL OIL FILTER SUB-ASSEMBLY
INSTALL STARTER ASSEMBLY
INSTALL COMMON RAIL ASSEMBLY
INSTALL FUEL SUPPLY PUMP ASSEMBLY
ADD ENGINE OIL
BLEED AIR FROM FUEL SYSTEM
ADD ENGINE COOLANT
INSPECT FOR COOLANT LEAK
INSPECT FOR FUEL LEAK
INSPECT FOR OIL LEAK