ENGINE OIL COOLER INSTALLATION

PROCEDURE


  1. INSTALL OIL COOLER ASSEMBLY


    1. Apply a light coat of engine oil to the 2 new O-rings.

    2. Install the 2 O-rings to the cylinder block sub-assembly.

    3. Install a new water outlet pipe gasket to the cylinder block sub-assembly.

    4. Install the oil cooler assembly to the cylinder block sub-assembly with the bolt and 5 nuts.

      Torque:
      15 N*m  { 153 kgf*cm, 11 ft.*lbf }
  2. INSTALL TURBOCHARGER SUB-ASSEMBLY

    Click here